Apron Safety Reconfiguration Project
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
The scope of works comprises the reconfiguration of three nose-in aircraft stands adjacent to the terminal building to improve apron safety, operational efficiency and passenger routing. The Works are anticipated to include, but are not limited to, the following elements: • Apron Reconfiguration and Geometry Reconfiguration of existing stand layout to provide three fully independent Code C stands, eliminating operational constraints associated with the existing arrangement and improving aircraft manoeuvrability. • Pavement and Civil Engineering Works Construction of new rigid pavement for aircraft stands, flexible pavement works for taxi lane and fillets, and localised rehabilitation and overlay works to existing apron areas. • Drainage and De-icing Infrastructure Provision of drainage infrastructure, including dedicated de-icing areas with appropriate collection and treatment systems. • Airfield Systems and Ancillary Infrastructure Integration of airfield ground lighting (AGL), markings, and associated electrical and ducting infrastructure required to support the revised apron layout. • Passenger Interface Improvements Provision of covered walkways and associated infrastructure to enhance passenger safety and segregation from aircraft and ground operations. The Works will be delivered within a live operational airport environment and will require careful planning, phasing and coordination to maintain ongoing operations, including aircraft movements, passenger flows and ground service activities. The Works will also be subject to airport security requirements, including Garda vetting, BSAT training, security clearance processes and compliance with all applicable airport access permit requirements. Please refer to the tender documents for more details
Lots1
Documentation4
- 2.0 MB
Apron Safety Reconfiguration Project (notice).pdf
PDF document
- 170.0 KB
IWA Apron Safety Reconfiguration Project_QQ.docx
Word document
- c4t_8850422_1.xml823 B
XML document
- 628.9 KB
IWA Apron Safety Reconfiguration Project_QQ.pdf
PDF document