9596-56A Dun Laoghaire Switch Panel week 43
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
Dun Laoghaire Switch Panel Renewal The detail provided re shift times and requirements is a best estimated and contractor should note that times may vary from that outlined as plan is developed in more detail. Allowances are needed to cover a faster and slower production timeline. IE will endeavor to provide as much detail and stick to outlined plan as reasonably practical. Plant shift time 1no proposed as 8 hours rates should cover for same. Shift Time Saturday Night into Sunday Morning 18.00hrs - 02.00hrs. Saturday 24th into Sunday 25th of October. Works to include removal of old panel. Bulk excavation of dig and grading of ballast formation plus compaction. Loading of dumpers, backfill and loading and tidy up of spoil. Lifting and install of switch panel. Ballast backfill and tamp head works through the switch panel. Plus machine a trailer to tend to welders. All requirements will be drawn down from this contract as required by the business and shall be planned and notified via weekly requests in line with normal company procedures. (An indicative draw down to year end is shown above, exact requirements will be advised via weekly requests). Hours above are not guaranteed. Saturday shift required on request. Works will be carried out at Dun Laoghaire with access via West Pier and Carlisle Pier. Included attachments on framework that will be required during this contract: - Bucket Additional - 2Ft, 3ft, 4ft, 6ft bucket, grading bucket. - Plough Bucket. -
Lots1
Documentation1
- 1.9 MB
9596-56A Dun Laoghaire Switch Panel week 43 (notice).pdf
PDF document