7946-368 Structural steel bridge repairs IE network
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
Steel bridge structural repairs contract labour requirements from September 2026 to March 2027. Location of works various sites on IE network. All contractors must provide a composite rate to include all there transport requirements. A 5 day week will have the following shift patterns 4 x 10 hour shifts and 1 x 8 hour shift. Shifts to consist of Mid-week (Mon - Fri) and Weekend (Sat - Sun). Bank Holiday working will also form part of a working week when required. A working week will consist of Day and Night shifts. Requirements below are our own maximum and will differ from week to week and will be drawn down by bridge gang manager as required. Contact Jason Maguire
Steel bridge structural repairs contract labour requirements from September 2026 to March 2027. Location of works various sites on IE network. All contractors must provide a composite rate to include all there transport requirements. A 5 day week will have the following shift patterns 4 x 10 hour shifts and 1 x 8 hour shift. Shifts to consist of Mid-week (Mon - Fri) and Weekend (Sat - Sun). Bank Holiday working will also form part of a working
Lots1
Documentation1
- 1.9 MB
7946-368 Structural steel bridge repairs IE network (notice).pdf
PDF document