72,5 kV Blue GIS - installaties

can-socialContract or concession award notice – light regime00564190-2026ANAlliander N.V.
Estimated value—
Deadline—
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
—
CPV codes
31214300 - Outdoor switching installations
Status
Awarded
Notice type
can-socialContract or concession award notice – light regime
Source
Estimated value
—
Publication date
13 Aug 2026, 22:00

Overview

Alliander N.V. is voornemens om middels de onderhandelingsprocedure zonder aankondiging op grond van artikel 3.36 lid 1 sub c onder 2 Aanbestedingswet 2012 een raamovereenkomst te sluiten met Siemens Energy B.V. ten behoeve van de levering van 72,5 kV Blue GIS installaties. Uit marktonderzoek van Alliander is gebleken dat Siemens Energy B.V. de enige partij is die in staat is de installaties te leveren die aan de eisen en specificaties van Alliander voldoen. Alliander is voornemens vijf (5) nieuwe onderstations te (doen) realiseren. Daartoe is zij voornemens vijf (5) GIS schakelinstallaties in te kopen. Alliander heeft een aantal locaties beschikbaar waarop zij voornemens is de nieuwe onderstations te plaatsen. Deze onderstations zijn gepland voor realisatie na 1-1-2028. De selectie van de locaties voor deze onderstations heeft plaatsgevonden voor de ingang van de F-gassen verordening. Hierbij is rekening gehouden met de afmetingen van schakelinstallaties van het SF6-houdende soort. Uitbreiding van de locaties is niet mogelijk. Zij kan daarom enkel schakelinstallaties aanschaffen die binnen de afmetingen van deze locaties passen. Maximale afmetingen (BxDxH) per veld zijn: • Busbar: 800 x 4250 x 2870 mm • Transformer bay (50 kV transformer): 800 x 4470 x 2600 mm • Transformer bay (150/110 kV transformer): 800 x 5275 x 2870 mm • Cable bay: 800 x 4470 x 2600 mm • Busbar coupling bay: 800x 3650 x 2600 mm Het uitbreiden van de locaties is niet mogelijk.  Verder vereist Alliander een nominale rail  stroom van 3150A en 40 kArms / 3 s kortsluitvastheid. Op grond van de Europese F-gassenverordening is het Alliander in beginsel niet meer toegestaan om na 1-1-2028 SF6-houdende installaties in bedrijf te nemen met een spanningsniveau vanaf 52 kV tot en met 145 kV. Alliander heeft mede daarom de volgende eis geformuleerd waaraan het in de schakelinstallatie gebruikte isolatie- en blusmedium moet voldoen: ‘Gasmixtures with GWP ≤1 and vacuum (SF6 gas and PFAS are not permitted)’. Uitsluiting van het gebruik van PFAS-houdend gas (in het bijzonder C4FN) geschiedt om de volgende redenen die deze keuze ieder voor zich en alle tezamen legitimeren: 1. Minimalisatieplicht ZZS ten aanzien van het vrijkomen van Zeer Zorgwekkende Stoffen (ZZS), waaronder PFAS. 2. Zorgplicht voor personeel. Alliander heeft een zorgplicht gedurende de volledige levensduur van haar schakelinstallaties. Van PFAS-houdende gassen is bekend dat zij onomkeerbare gezondheidsrisico's met zich meebrengen. Schakelinstallaties zijn bovendien niet volledig lekvrij. Alliander wil haar personeel niet aan deze risico's blootstellen. 3. Bescherming van het milieu. Van PFAS-houdende gassen is bekend dat zij onomkeerbare risico's voor de natuur met zich brengen. Alliander wil geen onnodige schade toebrengen aan het milieu. 4. Uniformiteit. Alliander heeft op dit moment geen PFAS-houdende installaties in gebruik, waardoor haar personeel gedurende de volledige levensduur van dergelijke installaties specifiek hiervoor opgeleid en gecertificeerd zou moeten worden. Een eventueel toekomstig verbod zou het parallel in bedrijf houden van meerdere systemen leiden tot inefficiëntie in opleiding en inzet van personeel. Alliander wenst zo veel mogelijk uniformiteit in haar installaties te hebben en daarbij volledig in te zetten op toekomstbestendige keuzes.     5. Onzekerheid over beschikbaarheid op lange termijn. De installaties hebben een levensduur van ten minste 40 jaar, die in de praktijk kan oplopen tot 60 jaar en, in geval van lekkage, bijgevuld moeten worden met gas. De beschikbaarheid van PFAS-houdende gassen is op de lange termijn onzeker, waardoor de levensduur van de installaties significant ingekort zou kunnen worden. 6. Onvoldoende onderzoek naar C4FN. C4FN is een relatief nieuw ontwikkeld gas waarnaar nog onvoldoende onderzoek is gedaan. De onafhankelijke en afhankelijke onderzoeken geven nog geen eenduidig resultaat. Alliander wil geen technologie in gebruik nemen waarvan de risico's nog niet voldoende in kaart zijn gebracht. Isolatiemediums met GWP ≤1 en vacuüm (zonder SF6 en PFAS) bieden de zekerheid dat deze niet voornoemde risico’s voor milieu en gezondheid met zich brengen. Ook is geen verbod op deze technologie voorzien, waardoor de zekerheid bestaat dat installaties op basis van deze technologie gedurende de hele levensduur kunnen worden onderhouden. Op lange termijn is standaardisatie van schakelaars in het elektriciteitsnet een belangrijk uitgangspunt. Vanwege snel ontwikkelende regelgeving, is deze technologie het meest toekomstbestendig.    Geen redelijk alternatief of substituut Alliander heeft een marktonderzoek uitgevoerd waaruit bleek dat er geen andere partijen dan Siemens zijn die aan alle voornoemde eisen kunnen voldoen. De VT Blue GIS is de enige installatie aan alle eisen voldoet en die qua omvang past binnen de locaties die Alliander beschikbaar heeft om nieuwe stations te realiseren.  Voor alternatieve installaties die aan de andere eisen voldoen, zou ten minste 25% meer ruimte vereist zijn. Het aankopen van extra ruimte is niet mogelijk. Bezwaar Indien u bezwaar heeft tegen de voorgenomen gunning van de opdracht aan Siemens, althans van mening bent dat met voornoemde gunning ten onrechte een beroep gedaan is op een uitzonderingsgrond, kunt u uw bezwaren kenbaar maken door een kort geding aanhangig te maken binnen twintig (20) kalenderdagen na de datum van deze publicatie. Indien dat niet gebeurt, kan de hierboven beschreven overeenkomst tot stand worden gebracht en kunnen dergelijke bezwaren niet meer leiden tot aantasting (vernietiging) van de overeenkomst.

Alliander N.V. intends to award a framework agreement to Siemens Energy B.V. through the negotiated procedure without prior publication pursuant to Article 3.36(1)(c)(2) of the Dutch Public Procurement Act 2012 for the supply of 72.5 kV Blue GIS installations. Market research conducted by Alliander has demonstrated that Siemens Energy B.V. is the only supplier capable of providing installations that meet Alliander’s requirements and specifications. Alliander intends to realize five (5) new substations. To that end, it intends to procure five (5) GIS switchgear installations. Alliander has identified a number of sites on which it intends to construct the new substations. These substations are scheduled to be commissioned after 1 January 2028. The selection of these sites took place prior to the entry into force of the F-gas Regulation and was based on the dimensions of SF₆-containing switchgear installations. Expansion of the sites is not possible. Consequently, Alliander can only procure switchgear installations that fit within the available site dimensions. The maximum dimensions (W × D × H) per bay are: • Busbar bay: 800 × 4250 × 2870 mm • Transformer bay (50 kV transformer): 800 × 4470 × 2600 mm • Transformer bay (150/110 kV transformer): 800 × 5275 × 2870 mm • Cable bay: 800 × 4470 × 2600 mm • Busbar coupling bay: 800 × 3650 × 2600 mm Furthermore, Alliander requires a nominal busbar current of 3150 A and a short-circuit withstand rating of 40 kArms / 3 s. Under the European F-gas Regulation, Alliander is, in principle, no longer permitted to commission SF₆-containing installations with voltage levels from 52 kV up to and including 145 kV after 1 January 2028. Accordingly, Alliander has formulated the following requirement for the insulation and interruption medium used in the switchgear installation: "Gas mixtures with GWP ≤1 and vacuum (SF₆ gas and PFAS are not permitted)." The exclusion of PFAS-containing gases (in particular C4FN) is justified by the following reasons, each of which individually and collectively supports this choice: 1. Minimalisatieplicht ZZS ten aanzien van het vrijkomen van Zeer Zorgwekkende Stoffen (ZZS). This includes PFAS, which are classified as substances of very high concern under Dutch environmental legislation. 2. Duty of care towards personnel. Alliander has a duty of care throughout the entire service life of its switchgear installations. PFAS-containing gases are known to pose irreversible health risks. Moreover, switchgear installations are not entirely leak-tight. Alliander does not wish to expose its personnel to these risks. 3. Environmental protection. PFAS-containing gases are known to pose irreversible risks to the environment. Alliander aims to avoid unnecessary environmental harm. 4. Standardization and uniformity. Alliander currently operates no PFAS-containing installations. Consequently, its personnel would need to be specifically trained and certified throughout the entire service life of such installations. A potential future prohibition could require the parallel operation of multiple technological systems, resulting in inefficiencies in personnel training and deployment. Alliander seeks to maintain maximum uniformity across its installations and to make future-proof technology choices. 5. Uncertainty regarding long-term availability. The installations have an expected service life of at least 40 years and, in practice, may remain in operation for up to 60 years. In the event of leakage, gas replenishment may be required. The long-term availability of PFAS-containing gases is uncertain, which could significantly shorten the operational lifespan of the installations. 6. Insufficient research on C4FN. C4FN is a relatively recently developed gas for which insufficient research has been conducted. Independent and industry-sponsored studies have not yet yielded consistent conclusions. Alliander does not wish to adopt technology whose risks have not yet been adequately assessed. Insulation media with a GWP ≤1 combined with vacuum interruption technology (excluding SF₆ and PFAS) provide assurance that the aforementioned environmental and health risks are avoided. Furthermore, no future ban on this technology is currently anticipated, providing confidence that installations based on this technology can be maintained throughout their entire service life. In the long term, standardization of switchgear technologies across the electricity network is an important objective. Given the rapidly evolving regulatory landscape, this technology represents the most future-proof solution. No Reasonable Alternative or Substitute Alliander conducted a market analysis which concluded that no supplier other than Siemens is capable of meeting all of the above requirements. The VT Blue GIS is the only installation that satisfies all requirements while also fitting within the space available at the identified substation sites. Alternative installations that satisfy the other technical requirements would require at least 25% more space. Acquiring additional land or expanding the available sites is not possible. Objections If you object to the intended award of the contract to Siemens, or if you believe that the above-mentioned award wrongly relies on an exception to the procurement rules, you may make your objections known by initiating summary proceedings (kort geding) within twenty (20) calendar days of the date of publication of this notice. If no such proceedings are initiated within this period, the agreement described above may be concluded and such objections can no longer result in the annulment or invalidation of the agreement.

Contracting authorities1

AN

UNKNOWN 34108286

nlArnhem, Netherlands
[email protected]

Lots1

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.