25-197 Housing Adaption Grant 13 Oaklawns Kilmeague, Naas, Co. Kildare, W91 CCF6
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
Work includes: # Re-hinge bathroom door to open to the right as shown on drawing T-4201. # Removal of existing bathroom appliances WC, WHB and bath. # Removal off the wall tiles along the bath/shower area and the splash back over the sink in the bathroom. # Removal of the existing floor covering. # Tile the floor and the walls (floor to ceiling). # Remove the internal boxed in SVP pipe and construction a new external SVP pipe to be connected to the nearest AJ/MH. # All pipe work to be recessed and sent to the external S.V.P. # Allow for tanking the whole bathroom to a height of 1.5m in the shower area and a height of 200mm in the rest of the bathroom. # Removal of all demolition debris from site and suitable disposal. # Install new Level Access Shower and grab rails. # Install new WC and grab rails # Install new WHB. # Install new wall mounted Bariatric seat with legs and arms. # Install new folding half height doors. # Install new u-shaped shower curtain rail and weighted split shower curtain # Install Wall mounted electric heater. # Install a new wall mounted mirror with shaver charging point and light above the sink. # Install passive air vent and mechanical extractor fan vented externally. # Remove the door saddle and make good. # Repaint the existing bathroom ceiling with two coats of bathroom paint. # Paint all woodwork including door, doorframe, and architrave on both sides. # Full remedial works to the existing bathroom as necessitated by the works (e.g., reinstatement of floors, walls, and ceilings.). • Check all external drainage both Surface and Foul to ensure it is adequate and working. Construction new surface water and foul mains if necessary. • Removal of all demolition debris from site - which is to be suitably disposed of. All builders waste associated with demolition to be removed and disposed of in accordance with current legislation. • All new work to comply with current Building Regulations standard, KCC issued drawings and KCC standard specification. • Full remedial works to the existing dwelling necessitated by the works. (e.g., make good the walls, allow for re-painting as required.) to be included. • Tying in all services to existing and making good all finishes affected by work both externally and internally to be included. • Please note that the house will be occupied throughout the construction period.
Lots1
Documentation1
- 1.9 MB
25-197 Housing Adaption Grant 13 Oaklawns Kilmeague, Naas, Co. Kildare, W91 CCF6 (notice).pdf
PDF document