2-BYM-2025 Framework agreement for construction work electro

can-standardContract or concession award notice – standard regime00349109-2026OEOslo municipality c/o the Agency for Urban Environment
Estimated valueNOK 100,000,000
Deadline—
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
—
CPV codes
45000000 - Construction work45100000 - Site preparation work45112000 - Excavating and earthmoving work45112100 - Trench-digging work45112710 - Landscaping work for green areas
Status
Awarded
Notice type
can-standardContract or concession award notice – standard regime
Source
Estimated value
NOK 100,000,000
Publication date
20 May 2026, 22:00

Overview

The aim of the procurement is to enter into a Framework agreement for the purchase of construction work in connection with electrical works that can include the entire Urban Environment Agency ́s management area. The electrotechnical installation will be carried out in separate framework agreements/contracts. The framework agreement gives the contracting authority the right to purchase goods or services covered by this framework agreement. The Contracting Authority is not obliged to procure any specific amount of goods or services in the framework agreement period, and the framework agreement is not exclusive. The framework agreement will include construction work for electrotechnical installations within roads and streets, urban areas, park areas, walking paths, at sports facilities, recreation areas and other public and private areas). Typical electrotechnical installations are; traffic lights, electrical outlets for events, charging stations, lighting, vending machines and other electrical installations. This involves excavation works, replacement of matter and filling in street foundations, ditches, parks as well as other public and private areas. This will typically be the establishment of conduits, cable channels and foundations for electrotechnical installations, for example the placement of prefabricated foundations or form work and casts for cast on site. Furthermore, there shall also be re-establishment of roads, pavements and green areas in accordance with prevailing standards from Oslo municipality. In some cases the assignment can also include changes to the current geometry in order to adapt to a more modern and different use of the area. The assignments can also involve temporary traffic changes, securing the work area and taking care of HSE and the outer environment. Tenderers must also reckon on coordination with third parties (this can be, among other things, the network owner, other contractors and/or the contracting authority wishes to take in). Call-offs will be carried out based on a description and overview of amounts in accordance with price posts, necessary maps and sketches, with reference to Oslo municipality ́s norms and templates. The scope is described in more detail in the requirement specification. A parallel framework agreement shall be signed with 2 tenderers. Tenderers shall at all times have the capacity to carry out at least three simultaneous call-offs against the framework agreement. The estimated total need is NOK 100 million excluding VAT in the framework agreement over a four year period. The contracting authority draws attention to the fact that the estimate is based on previous consumption and the expected future need. The need will depend on political guidelines and budget allocations in the period. The maximum value/turnover for the contract is NOK 125 million excluding VAT. A requirement specification (Annex 2.2) has been prepared that describes in more detail what this framework agreement shall cover. Examples of relevant call-offs are in Annex 2.3 Example projects.

Contracting authorities1

Lots1

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.